Quarry Equipment

Description: Five major precautions for crusher installation
Group News
10/23/2018  
After the customer purchases the Quarry Equipment, it is a must-have to install and test the car. In order to ensure smooth production and unnecessary maintenance costs in the future, the installation process specification can be strictly followed to allow the production line to be put into operation smoothly, avoiding improper installation or failure to comply with the installation precautions. The resulting unnecessary maintenance costs, the following summarizes the five major precautions in the process of installing the crusher.1. The crusher equipment mainframe is fixed on the foundation of the concrete level by anchor bolts, which is more conducive to the crushing efficiency and function of the crusher, which greatly reduces the safety problems of the crusher during the crushing process.2, the installation should pay attention to the balance between the main body and the ground, so that in the production of the machine, the hammer is more effective in the operation of the broken stone, the balance of strength, more conducive to the crusher's mutual wear due to imbalance, Safely increases the life of the crusher.3. After installation, check whether the equipment is fixed firmly, check whether the bolts in various parts are loose, whether the main engine door is tight, whether the machine shaft can run normally, whether the lubricating oil is filled, etc., and the unreasonable place should be timely deal with.4. The installed dolomite crusher should be equipped with a power cord. It must be equipped according to the requirements of the manual and the rated power of the equipment, as well as the safety of the control switch to ensure normal power supply and safety of the power supply.5. After the completion of these inspections, carry out the test machine, first open the switch to see if the crusher can run normally to ensure that there is no problem, and then put the material into further operation. If there is no problem, the last step is to carry out the load test machine of the crusher. After the test machine is finished, the work can be carried out normally.
Group Messages
There are no messages yet
Group Owner: crushermachine169
Group Type: Open
© 2014 WritingRoom.com, LLC. ALL RIGHTS RESERVED
WRITING | POETRY WRITING | CREATIVE WRITING | WRITE A BOOK | WRITING CONTESTS | WRITING TIPS